The project involved building the concrete foundation pad and craning the Main Control Room into place for the Signalling, Communication and Power Equipment Rooms (SCR/CER/PER) for the 19km rail spur and loop being built to connect to the Norwich Park branch line.
- Copper & fibre cabling works
- Pit and pipe installation
- Signalling equipment Hut foundations
- Trackside equipment installation